Godrej Properties
Built from 2 candidate reports with 2 first-hand accounts, covering 2025-26, 2024-25.
Hiring process
Roles: Operational Trainee- 1
Online test
Operations aptitude test (civil core)Unstop50 min15 questionseasysurveying · building materials · strength of materials · RCC · structural analysis basics · concrete technology
Account says RCC is taught later than other topics, so give it extra revision.
- 2
Take-home assignment
Case study with slide-deck submissionUnstop10080 min3 questionshardIS codes for cement and concrete testing · critical path in high-rise projects · schedule risk mitigation
One week to submit an 8-slide deck (max 20 MB) plus optional annexure; plagiarism or AI-generated content disqualified. Only two questions are described though 3 are stated.
- 3
Aptitude test
Unstopeasyverbal ability · logical reasoning · quantitative aptitude
Duration stated as 40-45 minutes and 40-50 questions.
- 4
HR interview
Recorded video-answer behavioural roundSHL (AMCAT)20 min5 questionsonlinesituational judgement · handling pressure · handling disagreement with colleague
Candidates record and upload answers to 5 on-screen questions within a time limit; proctored. No group discussion round.
Advice from candidates
13 pieces of advice, in their own words. Names removed.
Focus more on RCC and concrete-related topics, as RCC is usually taught in the 6th semester, while most other topics are already covered in the 5th semester.
Online test · 2025-26
Go through the relevant IS codes
Online test · 2025-26
Add proper references (like IS codes, papers, or reports) to make your PPT look more professional.
Case study round · 2025-26
Keep your slides simple, neat, and to the point, don’t overload them with too much text.
Case study round · 2025-26
Loading the other 9…
Question patterns reported
The kind of problem, not the problem itself. Our practice questions are written to match these patterns.
- Onlinedirect civil core MCQs plus easy formula-based numericals
- Take-hometesting standards and failure consequences for cement and concrete
- Take-homecritical path delay and mitigation in tall building projects
- Aptitudedefinitions, standard values and formula-based easy numericals
- Take-homeconstruction project case: quality control, erosion risk, sustainability, technology use